13.1MW HFO Modular Power Station EPC
Energy Optimisation for Perenco Oil
In Guatemala’s Xan Field, USP&E partnered with Perenco Oil to design, build, and commission a 13.1MW HFO modular power station. Overcoming regulatory, environmental, and logistical challenges, USP&E delivered the project within 5 months, ensuring energy reliability and optimised operations. This case study highlights USP&E’s unmatched expertise in tailored power solutions for industrial energy demands.
Background
Tailored Engineering for Guatemala’s Oil Industry
Oil exploration and production company Perenco Guatemala has been operating in the country since 2001 producing oil from the Xan field, in Petén region. “Excellence in engineering, a focus on made-to-measure solutions and a sense of responsibility for what we do is our hallmark. And that’s how we’ll meet the challenges of tomorrow.”
– François Perrodo, Chairman
Challenges
Navigating Regulatory, Environmental, and Logistical Complexities
In Guatemala’s oil industry, we face regulatory complexities, infrastructure limitations, political instability, security risks, environmental standards, talent shortages, supply chain complexities, financial volatility, stakeholder engagement, and technological challenges. Success demands meticulous planning, risk management, and adaptability.
Solution
Delivering a 13.1MW Modular Power Station with EPC Excellence
13.1MW HFO / Diesel HHI 9L21/32 modular and packaged power station. Our scope of work as EPC and Commissioning. Full project completed by USP&E in under 5 months. Project was on time and on budget. USP&E handled design, procurement, engineering, construction and commissioning.
Outcome / Testimonial
Achieving Energy Optimisation with Tailored Solutions
“Perenco Guatemala Limited, certifies that USP&E. Americas, LLC has provided 8 LFO Generation units 1.66MW each; and relative auxiliary systems manufactured by HHI Co. LTD. for the energy optimisation project at Xan Field in Guatemala.”