PW FT8 HalfPac rehabilitation in Togo
Reliability and Longevity Restored in Togo
USP&E Global carried out a comprehensive rehabilitation of a PW FT8 Halfpac unit in Togo, involving detailed site assessments and specialised inspections to ensure the turbine’s optimal performance and reliability.
Scope of Work
1. Site Assessment: Conducted a thorough site evaluation to identify conditions and requirements.
2. Engine Borescope Inspections:
- Gas Generator (GG) Borescope: Detailed inspection to assess internal conditions.
- Brush Generator Borescope: Inspected for functionality and potential issues.
3. Ancillary Systems Rehabilitation:
- Cold Air Buffer System: Inspected and repaired for efficient cooling.
- GG/PT Lube Oil System: Evaluated and maintained to prevent wear.
- Hydraulic Starting System: Rehabilitated for reliable turbine startups.
- Generator Lube Oil System: Ensured full operational effectiveness.
-
Inlet Air Filter House: Assessed and cleaned for optimal air intake.
-
Bleed Air System: Inspected and repaired for pressure balance.
-
Fuel Skids: Serviced liquid and gas fuel skids for consistent delivery.
-
Water Injection System: Maintained for NOx control and efficiency.
-
Control and Protection Systems:
-
Woodward Micronet+ Control System
-
Generator Protection Relays
-
Bentley Nevada Vibration Monitoring
-
MMC and Citech HMI
-
Outcome
The rehabilitation restored the PW FT8 Halfpac to optimal operational condition, enhancing reliability, efficiency, and longevity.